Back to the Basics: Bank Station Placement – Part 2

Written by Chris Goodell | May 1, 2017


Expanding upon Chris’ discussion of where to place bank stations, what should you do about high terrain somewhere in the middle of your cross section?  Here is an example:
How should we treat the left overbank?  It’s hard to tell if the high area next the left bank is isolated (i.e., it would be an island if the water surface were to get to elevation 370 or so) or if it is a continuous feature (such as a levee) that would prevent flow from accessing the left overbank until it is overtopped.  Looking at this another way, is the lower ground of the left overbank a continuous flow path or is it an isolated low spot (for example, a mining pit)? Aerial photography can often help determine the situation; here is the overhead view for our example:
The area in question is vegetated (the terrain goes up steeply when it gets to the storage yard on the bottom of the photograph) but it is hard to tell if the high point in the terrain would be constraining flow or if the low area is a potential flow path.  Looking at the cross sections upstream and downstream of the one in question will often provide answers, but does not help in this particular example.  In this case, the best course of action would be to go out to the river and see for yourself, then imagine how the water would behave.  Depending on your conclusion, there are several ways that this can be modeled.
1.  Isolated high spot.  If flow can simply go around the high spot in this particular cross section then we probably don’t need any further adjustments. You may get a “divided flow” warning in the output that signifies that the program detected dry ground with water on either side, but no action is needed to address the warning in this case. Assuming that the computed water surface elevation is high enough, this solution will also allow flow in the left overbank.
2. Isolated low spot in overbank.  You could model this as per #1 above but in that case you should check flow distribution between the channel and overbanks up and downstream of this cross section for reasonable transitions (see earlier blog post from May 20, 2009).  Or, if you think that the low area should only store but not convey water you could set an ineffective flow limit as shown below.


3.  Continuous high ground.  If the high ground is really a ridge that would prevent the water from accessing the lower ground in the left overbank, it should be modeled as a levee. However, in this case another decision needs to be made depending on what happens after the levee is overtopped. Will the water be conveyed on the land side, or will it just pond?  If the latter you may need to add an ineffective flow limit at or just to the left of the levee.

4.  Something in between.  Regardless of whether the high or low features of the cross section are continuous, water is able to access the left overbank.  Natural streams often have “backswamp” areas behind either human-made or natural levees that flood and store water but do not really convey much flow downstream. If the left overbank in our example is like this, we could model it by using the ineffective flow limit as per #2 above.  However, ineffective flow means zero conveyance.  If we expect some water to move in the overbank, albeit very slowly, you may want to allow a small non-zero conveyance.  A few sharp-eyed readers may have noticed that we are using a Manning’s roughness coefficient of 0.3 in the left overbank. Using this value allows a small amount of conveyance in that overbank without zeroing it out completely.

Comments

  1. Jennifer Morreale

    on May 3, 2017

    if you were to set your ineffective flow elevation to something higher than the ground, how would it differ from #3 (making it a levee)?

  2. Chris Goodell

    on May 3, 2017

    Once it overtops the high ground water can be on the other side. If the ineffective flow elevation is higher than the high ground point, then the water on the other side will remain ineffective even after the levee is overtopped. It will remain so until the ineffective flow trigger is exceeded by the water.

  3. Arlan Scortegagna

    on July 14, 2017

    Chris, I'm working on a Dam Break study, in which the floodplains are crammed with such "backswamps". They are like the "isolated low spots in overbanks", but these spots create continuous paths that follow the river for something about 500 m or so until they reach some higher ground in the overbank (they are potentially floodable areas with lower elevations than average water surface elevation – about 3 feet or so – and I don't know the technical term for them in english). From your post, I've decided the best way to model it is by using ineffective flow areas (permanent) only for the cross sections that contains these "backswamps". By doing nothing, considering just the condition of divided flow in higher stages, my flood wave attenuation was below expected. But the problem is that by considering these ineffective flow areas, the peak discharges downstream went higher and I've got even less attenuation. I expected the peak discharges would fall dramatically, since these ineffective flow areas are large and they act like a series of storage volumes, not accounting for conveyance during the flood wave. Well it didn't happen. So I've increased Manning n coefficients for theses "pools" and finished the job. Do you have any idea why this happen? Or am I just doing something wrong?

    Thanks!

  4. Viet Le

    on November 8, 2017

    Is it okay to have a bank sta elevation significantly higher on one side(1 ft difference)?

  5. Chris Goodell

    on November 8, 2017

    Yes. That’s no problem

  6. Lorena L

    on November 3, 2022

    Hi community, I’m having trouble with my hydraulic model. My river has an extensive floodplain and in some cross-sections, the main channel is located higher than other parts of the same cross-section. How could I manage this issue considering that the flow should run through the main channel?

  7. Chris Goodell

    on November 3, 2022

    First, make sure your bank stations surround the higher channel that you are calling your main channel. Then consider: can water get over to the deeper side channel? If so, make the deeper side channel ineffective by using ineffective flow areas. If not, then put a levee marker on the high ground between the main channel and the deeper side channel to prevent water frmo going over there.

  8. Lorena L

    on November 3, 2022

    Hi all! I’m having problems with my model. My river has an extended floodplain. In some cross-sections, the main channel is located higher than other parts of the same section, which are, for example, the former main channels. How could I make the flow go through the main channel?

  9. Chris Goodell

    on November 3, 2022

    First, make sure your bank stations surround the higher channel that you are calling your main channel. Then consider: can water get over to the deeper side channel? If so, make the deeper side channel ineffective by using ineffective flow areas. If not, then put a levee marker on the high ground between the main channel and the deeper side channel to prevent water from going over there.

Add Your Comment

Leave a Reply

nine − seven =


Related Posts

SEE ALL BLOG POSTS