Multiple Opening Analysis
Did you know that if you have a bridge opening and one or more culverts at a single river crossing a Multiple Opening Analysis is required?
Recently I’ve had some real difficult models to set up and run. Some real beasts. And some of these take hours to run. As you can imagine, when one of these models is crashing, strategies for effectively diagnosing and fixing errors become very important. You don’t want to “chase” problems in models with 2 hour run times. You’ll never get your model stable. You need to be able to diagnose the problem and come up with a confident fix, while minimizing the time spent running the model to “try out” possible fixes.
Here’s a real useful tool that has recently been added to HEC-RAS.
In the Runtime Computational Options, you have the option to “disregard” Lateral Structures, Storage Area Connections, Breaches, and Pumps in the computations. Let’s say you turn off lateral structures, rerun your model and it runs fine.
Then you know that there is a problem with one or more of your lateral structures. Simple diagnosing tool-but very effective.
Also, I’ve been using the Computation Level Output a lot. By checking this box on the Unsteady Flow Analysis window, you are able to look at some select output parameters at every computational time step interval. These parameters include water surface elevation, flow, and lateral inflow. You can view two types of plots: a spatial plot and a time series plot, by going to the “View” menu item on the main RAS window.
The first two are very useful, and at a computation interval level, can show you things that just won’t show up on the detailed output profile plots. However, the ability to monitor lateral inflow, graphically, and at the computation interval level, is a powerful way to determine when and how much discharge is entering a given reach laterally (via lateral structures from other reaches or storage areas).
This is a common source of errors that can lead to instabilities in complex HEC-RAS models, and aside from this plot, I don’t know of another way to graphically see this.
Comments
masauso sakala
on June 3, 2015hi, am modelling a large floodplain. how do i ensure parts of cross sections "depressions" don't fill up before the preceding depressions fill up.(
Chris Goodell
on June 3, 2015You can try using levee markers, or you can break the floodplain out as a storage area or 2D area and connect to the cross section using a lateral structure.